PRIDE Architecture and Interfaces &
PRIDE Logical Components and Integration Designs

Work Package 2 of Telematics for Libraries project PRIDE (LB 5624)
PRIDE
Title page
Table of Contents

Previous - Next

Document Control

Issue Number

Issue Date

Reason for Change

0.1

05/01/99

Initial, incomplete draft.

0.2

18/01/99

UKOLN amendments to first draft

1.0

26/02/99

Updates after QA input.

Scope Statement

This document provides the deliverables D2.4.1 and D2.4.2 of the European Union 4th Framework Telematics Project PRIDE, which commenced in June 1998 and is of two years duration.


1999-02-26 PRIDE Architecture and Interfaces &
PRIDE Logical Components and Integration Designs