JISC IE Metadata Schema Registry

WP7: Evaluation

  ILRT logo | Link to ILRT UKOLN logo | Link to home page

 -

Home Background Dissemination Contacts
Phase 1 WP1: Project management WP2: Model/Use WP3: Tools WP4: m2m WP5: Validation WP6: Policy WP7: Evaluation

Introduction

An evaluation of the work of the project up to and including the workshop in March 2005 was carried out by ESYS Consulting.

Documents